Water Construction Standards

Developer Information

Springfield Utility Board’s (SUB’s) Water System Development/Redevelopment Charges

SUB Board Policies on Water as of March 11, 2021 (PDF)

For more information on Water SDCs, please contact the Water Division at (541) 726-2396

For a guide and checklist of SUB’s development approval process, see SUB’s guide for developers (PDF)


Standard Construction Specifications & Standard Drawing

Standard Construction Specifications

Acceptable manufacturers and products list (PDF)

01 33 00 Submittal Procedures (PDF)

31 23 00 Excavation and Backfill, Gen (PDF)

31 23 19 Dewatering (PDF)

31 23 33 Trenching and Backfill (PDF)

32 19 00 Surface Removal, Restoration (PDF)

32 29 00 Planting (PDF)

33 10 00 Water Mains and Appurtenances, General (PDF)

33 11 13.13 Ductile Iron Pipe, Fittings and Special Items-NF (PDF)

33 11 13.24 Polyethylene Pressure Pipe (PDF)

33 12 13 Water Service Connections (PDF)

33 12 16 Water Distribution Valves (PDF)

33 12 19 Fire Hydrants (PDF)

33 13 00 Pipeline Testing and Disinfection (PDF)

WSC Standard Drawings

Standard Drawings Index

Revision History / Date of Revision

Revision 1 March 29, 2013 (PDF)

Revision 1.1 October 29, 2013 (PDF)

Revision 1.2 January 8, 2014 (PDF)

Revision 2.0 January 2018 (PDF)

Revision 3.0 February 2020 (PDF)

Revision 4.0 March 2021 (PDF)

Revision 5.0 October 2021 (PDF)

Revision 5.1 August 2022 (PDF)

Revision. 6.0 May 2023 (PDF)


Water Design & Construction Manual

SUB Water Design and Construction Manual_1.2 (PDF)

Water Design & Construction Manual: Chapter 5 – Downloadable Content

5.1 Electronic Transmittal Form (PDF)

5.2 WSC Land Division STD Notes (PDF)

5.3 Record Drawing Example (PDF)

5.4 Infrastructure Location Forms (As-built/Record drawing purposes)

5.5 Preliminary Project Document Examples (for reference only)