Developer Information
Springfield Utility Board’s (SUB’s) Water System Development/Redevelopment Charges
SUB Board Policies on Water as of March 11, 2021 (PDF)
For more information on Water SDCs, please contact the Water Division at (541) 726-2396
For a guide and checklist of SUB’s development approval process, see SUB’s guide for developers (PDF)
Standard Construction Specifications & Standard Drawing
Standard Construction Specifications
Acceptable manufacturers and products list (PDF)
01 33 00 Submittal Procedures (PDF)
31 23 00 Excavation and Backfill, Gen (PDF)
31 23 33 Trenching and Backfill (PDF)
32 19 00 Surface Removal, Restoration (PDF)
33 10 00 Water Mains and Appurtenances, General (PDF)
33 11 13.13 Ductile Iron Pipe, Fittings and Special Items-NF (PDF)
33 11 13.24 Polyethylene Pressure Pipe (PDF)
33 12 13 Water Service Connections (PDF)
33 12 16 Water Distribution Valves (PDF)
33 13 00 Pipeline Testing and Disinfection (PDF)
WSC Standard Drawings
Revision History / Date of Revision
Revision 1 March 29, 2013 (PDF)
Revision 1.1 October 29, 2013 (PDF)
Revision 1.2 January 8, 2014 (PDF)
Revision 2.0 January 2018 (PDF)
Revision 3.0 February 2020 (PDF)
Revision 5.0 October 2021 (PDF)
Revision 5.1 August 2022 (PDF)
Water Design & Construction Manual
SUB Water Design and Construction Manual_1.2 (PDF)
Water Design & Construction Manual: Chapter 5 – Downloadable Content
5.1 Electronic Transmittal Form (PDF)
5.2 WSC Land Division STD Notes (PDF)
5.3 Record Drawing Example (PDF)
5.4 Infrastructure Location Forms (As-built/Record drawing purposes)
5.5 Preliminary Project Document Examples (for reference only)
- A – Land Division Response Letter (PDF)
- B – Design by Others Notification (PDF)
- C – Design-Build Agreement (PDF)
- D – Letter of Agreement (PDF)
- E – Attachment 1 (PDF)
- F – Notice of Substantial Completion (PDF)
- G – Project Punch List (PDF)
- H – Notice of Project Acceptance (PDF)
- I – Notice of Project Completion (PDF)