COMMERCIAL/INDUSTRIAL ELECTRIC SERVICE CONSTRUCTION REQUEST FORM – Please return this form completed and signed to SUB’s Electric Service Center.

RESIDENTIAL ELECTRIC SERVICE CONSTRUCTION REQUEST FORM– Please return this form completed and signed to SUB’s Electric Service Center.

1. Trenching Details ESD0074 (4-pages): Includes backfill, trench dimension, and street crossing requirements.

2. Typical Joint Trench Detail #FF11DE64 (1-page): Guide for trench proximity to property lines and existing or planned utility/communication facilities as well as the orientation of utility/communication conduits within a joint trench.

3. Secondary Junction Box Entrance ESD0075 (1-page): Guide for the installation of secondary junction boxes and orientation of conduits entering them.

4. Vault Installation Notes and Details ESD0070 (4-pages): Concrete vault installation requirements including backfill, grounding, and proximity requirements. Conduit orientation when entering a vault and spacing requirements also addressed.

5. Typical Overhead Temporary Service ESD0100 (2-pages): Includes drawings with spacing/clearance requirements for the installation of temporary overhead services.

6. Typical Overhead Meter Pole Service ESD0103 (2-pages): Includes drawings with spacing/clearance requirements for installation of overhead meter pole service.

7Typical Overhead Service ESD0102 (2-pages): Includes drawings with spacing/clearance requirements for the installation of overhead services.

8. Typical Underground Meter Post Service ESD0107 (2-pages): Includes drawings with spacing/clearance requirements for installation of an underground meter post.

9Typical Underground Pedestal Service ESD0109 (2-pages): Includes drawings with spacing/clearance requirements for installation of an underground pedestal service.

10. Typical Underground Temporary Service ESD0104 (2-pages): Includes drawings with spacing/clearance requirements for installation of temporary underground services.

11. Typical Underground Service ESD0105 (2-pages): Includes drawings with spacing/clearance requirements and customer responsibilities for installation of underground services from a padmount transformer vault or junction box.

12. Typical Underground Service Feed Overhead ESD0106 (2-pages): Includes drawings with spacing/clearance requirements and customer responsibilities for installation of underground services that are fed from an overhead structure.

13. Temporary Mid-span Supports ESD0101 (2-pages): Includes drawings with spacing/clearance requirements for the construction of temporary structures to support overhead service conductors. 

14. Customer Requirements for Meters ESD0090 (7-pages): Includes meter installations requirements.

15. Developer Supplied Materials (1-page): Includes SUB specifications for conduit and mule tape that may be required for a development project.