Electrician Developer Resources

Electrician Information

Supervising Electrician Form (PDF)

Developer Information

Springfield Utility Board’s (SUB’s) Electric System Development/Redevelopment Charges: Current Electric DRCs (PDF)

For more information on Electric DRCs, please contact the Electric Division at (541) 726-2395.

For a guide and checklist of SUB’s development approval process, see SUB’s guide for developers (PDF)

Electric Developer Standards

Commercial/Industrial Electric Service Construction Request Form (PDF) – Please return this form completed and signed to SUB’s Electric Service Center.

Residential Electric Service Construction Request Form (PDF) – Please return this form completed and signed to SUB’s Electric Service Center.

  1. Trenching Details ESD0074 (4-pages) (PDF): Includes backfill, trench dimension, and street crossing requirements.
  2. Typical Joint Trench Detail #FF11DE64 (1-page) (PDF): Guide for trench proximity to property lines and existing or planned utility/communication facilities as well as the orientation of utility/communication conduits within a joint trench.
  3. Secondary Junction Box Entrance ESD0075 (1-page) (PDF): Guide for the installation of secondary junction boxes and orientation of conduits entering them.
  4. Vault Installation Notes and Details ESD0070 (4-pages) (PDF): Concrete vault installation requirements including backfill, grounding, and proximity requirements. Conduit orientation when entering a vault and spacing requirements also addressed.
  5. Typical Overhead Temporary Service ESD0100 (2-pages) (PDF): Includes drawings with spacing/clearance requirements for the installation of temporary overhead services.
  6. Typical Overhead Meter Pole Service ESD0103 (2-pages) (PDF): Includes drawings with spacing/clearance requirements for installation of overhead meter pole service.
  7. Typical Overhead Service ESD0102 (2-pages) (PDF): Includes drawings with spacing/clearance requirements for the installation of overhead services.
  8. Typical Underground Meter Post Service ESD0107 (2-pages) (PDF): Includes drawings with spacing/clearance requirements for installation of an underground meter post.
  9. Typical Underground Pedestal Service ESD0109 (2-pages) (PDF): Includes drawings with spacing/clearance requirements for installation of an underground pedestal service.
  10. Typical Underground Temporary Service ESD0104 (2-pages) (PDF): Includes drawings with spacing/clearance requirements for installation of temporary underground services.
  11. Typical Underground Service ESD0105 (2-pages) (PDF): Includes drawings with spacing/clearance requirements and customer responsibilities for installation of underground services from a junction box.
  12. Typical Underground Service Feed Overhead ESD0106 (2-pages) (PDF): Includes drawings with spacing/clearance requirements and customer responsibilities for installation of underground services that are fed from an overhead structure.
  13. Temporary Mid-span Supports ESD0101 (2-pages) (PDF): Includes drawings with spacing/clearance requirements for the construction of temporary structures to support overhead service conductors.
  14. Customer Requirements for Meters ESD0090 (8-pages) (PDF): Includes meter installations requirements.
  15. Developer or Contractor Supplied Materials ESD0116 (PDF): Includes SUB specifications for conduit and mule tape that may be required for a development project.
  16. Padmount Transformer Location Requirements ESD0115 (3-pages) (PDF): Includes minimum distance installation requirements to buildings, windows, fuel sources, and other obstacles.
  17. Alternate Transformer Location in Alcove or Vault Room ESD0117 (18-pages) (PDF): Alternate Specification with requirements for locating utility-owned padmount transformers within a building footprint.
  18. ESD0118 – Multi-Story Metered Installations:This standard specifies metering requirements for high-rise, multi-story residential, commercial, and mixed-use buildings that include rental and/or owner-occupied dwelling units and/or commercial units.
  19. ESD0118-A – Installation Checklist: This checklist will be exchanged between SUB and the Customer multiple times to advance past hold points as described in ESD0118. SUB written approval will be required for each hold point.